New SCADA System Lets PUC Open/Close Valves Remotely

PUC Services Inc. in Ontario Canada has launched its new supervisory control and data acquisition system (SCADA) during a ribbon cutting event at its water treatment plant on Second Line West. PUC president Rob Brewer says the SCADA upgrade will ultimately boost efficiency

ICONICS and SUSiEtec Connects SCADA with the Cloud

S&T Technologies and ICONICS have signed a collaboration agreement. ICONICS is a automation software provider, designing advanced solutions for web-enabled OPC UA and BACnet certified visualization, HMI and SCADA, as well as software solutions for the energy and manufacturing industries. Based on

AAEON Launches BOXER-6750 Box PC for SCADA Applications

AAEON has released the BOXER-6750, a DIN rail-mount-designed box PC with a rich I/O interface. The BOXER-6750 measures only 69 mm by 183 mm by 155 mm and is fitted with the Intel Core i3-6100U or, for customers with lower performance demands, the

Object Management Group Issues Requests For Information for a Command and Control User Definition Language

The Object Management Group (OMG), https://www.omg.org/ an international, open membership, not-for-profit technology standards consortium, issued a Command and Control User Definition Language Requests For Information https://www.omg.org/schedule/Command_and_Control_User_Definition_Language_RFI.html for input toward a common data display exchange format of a mission system so that these systems can be easily

Optimal Time Step of SCADA Data for the Power Curve of Wind Turbine

Minh-Thang Do and Julien Berthaut-Gerentes The SCADA system for wind turbine often logs data at 10 minutes time step, mostly due to the technical constraints. However, with the developement in measurement and storage technology, the collection of data with higher sampling frequency is feasible.

State of Goa India Introduces Smart-Grid SCADA Project

The Goa India State Electricity department proposes to introduce Smart-grid as pilot project for effective control of the consumer loads during peak demand. The State is facing current power deficit of one mega watt (MW) during peak hour. Goa Electricity Department in